Chute Feeder, Manufacturer of Chute Feeder Xinhai
A feeding device that feed ore to jaw crusher is needed before crushing, the pending ore particle size is about 350 mm, so the client chose Xinhai chute feeder. The device is lifting in discharge outlet of the ore bin, and can also set up on the floor according to the equipment requirements. In practice, the flush times of groove bottom reaches 60 times/min, the stroke reaches 200 mm, the